Costs
What planning actually costs in Horsham in 2026
The householder application fee, the prior approval fee, the pre-application charges Horsham District Council sets itself, and the one that costs nothing.
Facts checked 4 September 2026
Planning fees are two different things stacked on each other: national statutory fees, which are the same everywhere in England, and local pre-application charges, which each council sets itself. Here are both, as they stand for Horsham in 2026.
These are the council’s fees only. They do not include drawings, a structural engineer, a party wall surveyor or building control.
National statutory fees
Set nationally, current from 1 April 2026.
| Application | Fee |
|---|---|
| Householder — extension or alteration to a single house | £548 |
| Outbuildings, gates, fences or walls within the curtilage | £272 |
| Prior approval — larger home extension | £249 |
| Prior approval — additional storeys | £249 |
| Lawful development certificate (proposed) | Half the full application fee |
A householder application has a statutory determination period of eight weeks from validation. Validation is not instant — if anything is missing the clock does not start, so allow one to two weeks on top.
Horsham District Council’s own pre-application fees
These are the council’s charges for advice before you apply. They are optional, and on anything uncertain they are the best value on this page.
| Service | Fee (inc VAT) | Response |
|---|---|---|
| Do I need planning permission? | £65 | 28 days |
| Extensions and alterations to houses and flats | £105 | 28 days |
| Prior approvals | £230 | 42 days |
| One to two residential units | £260 | 42 days |
The logic is straightforward. If you are not sure whether your project needs permission, £65 answers it in writing. If you know it needs permission but not what the council will accept, £105 gets you a case officer’s view before you commission detailed drawings — which cost considerably more than £105 to redraw.
The free one
Applications for work to protected trees cost nothing.
This matters more than it sounds, because the threshold for protection is low. Every tree in a conservation area with a trunk over 75mm in diameter measured 1.5 metres above the ground is protected, as is any tree anywhere covered by a Tree Preservation Order. Six weeks’ written notice is required for work to a conservation area tree.
Since the application is free and unauthorised work to a protected tree is a criminal offence, there is no argument for guessing.
What else the project will cost before anyone builds
The application fee is rarely the largest number.
- Drawings. Measured survey plus existing and proposed drawings. Expect this to exceed the application fee comfortably.
- Structural engineer. Needed wherever load-bearing structure is removed or an opening is spanned.
- Building control. Separate from planning, and always required. Applications in this district go to Sussex Building Control, the shared service run by Horsham District Council and Crawley Borough Council.
- Party wall surveyors. If a neighbour dissents from your notice — and silence counts as dissent — surveyors are appointed and an award drawn up. Their fees are normally paid by the person doing the work.
- Any specialist reports the council asks for. Ecology, arboriculture, heritage. More likely in a conservation area or near protected trees.
One thing that has just got cheaper, and almost nothing online says so
For four years, development across the Sussex North water supply zone — which covers much of Horsham District — was constrained by Natural England’s water neutrality position, requiring statements and offsetting payments.
That position was withdrawn on 31 October 2025. From 1 November 2025 no water neutrality statement is required and no payment into the certification scheme is needed; the scheme will not now launch. New dwellings still have to meet the tighter water efficiency standard of 110 litres per person per day under the council’s own policy.
Most of what is written online about developing in Horsham still describes the old regime. If someone quotes you for a water neutrality statement, that is out of date.
Where the fees come from
Statutory fees are set nationally and published by the Planning Portal. Pre-application fees, tree applications and the water neutrality position are Horsham District Council’s own, published on their website. Both change — the statutory schedule is updated periodically and councils revise their own charges — so check before relying on any figure here.
What to do next
If the question is whether your project needs permission at all, £65 to the council answers it definitively. If the question is what it will cost to build, that is a different conversation.
Tell us what you are planning and we will give you an itemised written quotation for the building work.
Planning work in Horsham?
Tell us what you have in mind and we will give you an honest view.


