Extensions
How long does a house extension take, realistically
The build is the short part. Here is where the months actually go, stage by stage, and what genuinely causes the overruns.
Read the guide
Advice
What the rules actually say, what the work actually involves, and where the money actually goes. Written for people deciding whether to start.
Extensions
The build is the short part. Here is where the months actually go, stage by stage, and what genuinely causes the overruns.
Read the guide

Extensions
A second storey is rarely double the price of the first, because the expensive parts are already paid for. That changes the maths more than people expect.
Read the guide
Planning
Two separate processes, two separate applications, two separate outcomes. The one people skip is the one that matters when you sell.
Read the guide

Planning
Often not — but Horsham District has four separate designations that take those rights away, and one of them decides your application isn't even the council's job.
Read the guide
Planning
Four of them are in Horsham town itself. Inside one, you lose side extensions, two-storey rear extensions and permitted development loft conversions outright.
Read the guide
Planning
If your project genuinely is permitted development, you do not need permission. You should still get the certificate, and here is what happens if you do not.
Read the guide
Planning
Usually not — unless you are in one of Horsham District's 39 conservation areas, where the right disappears completely and every dormer needs an application.
Read the guide
Planning
Three different notice periods, two excavation rules almost every extension trips, and one detail that catches everybody — a neighbour saying nothing counts as dissent.
Read the guide
Planning
Since 1997, every extension in Slinfold Conservation Area has needed a full planning application — no exceptions, whatever the size.
Read the guide
Planning
If your property is in the South Downs National Park, Horsham District Council does not decide your application. Different authority, different portal, different policies.
Read the guide
Costs
The householder application fee, the prior approval fee, the pre-application charges Horsham District Council sets itself, and the one that costs nothing.
Read the guide

Costs
Two extensions of identical size can differ by tens of thousands. Almost none of that is the walls. Here is where it actually goes.
Read the guide
Kitchens
Plenty of people order from a showroom and want a builder to fit it. That works well — as long as somebody checks the plan before you place the order.
Read the guide

Kitchens
Six or seven trades in a fixed order, in the one room you cannot stop using. Getting the sequence right matters more than which units you buy.
Read the guide

Bathrooms
An extractor fan is a regulatory requirement with a minimum rate, and the most common way of installing one badly does real damage to a roof.
Read the guide

Bathrooms
They look similar in a brochure and are very different jobs underneath. The difference is the floor, and it is decided before any tiling starts.
Read the guide
Hiring a builder
Not always. But you do need drawings, and you almost certainly need a structural engineer — which is a different person and not optional.
Read the guide
Hiring a builder
Three quotes for the same job can differ by tens of thousands and all be honest. The difference is usually what is in them, not what they cost.
Read the guide
Hiring a builder
Most of these take a minute to answer. The answers tell you more than a price does, and the awkward ones tell you most.
Read the guide
Hiring a builder
A quotation is the document you will argue from if anything goes wrong. Here is what belongs in one, and what a missing section usually means.
Read the guide
Ask it. We would rather talk something through before you commit to it than after.